Post Plan (Start Here)

Download complete checklist Download tracker CSV

Ten checks before post starts

  1. Make two verified copies before formatting a card. Otherwise footage can be erased.
  2. Name the person responsible for the image pipeline. Otherwise departments repeat incompatible work.
  3. Count and break down VFX before bidding. Otherwise missing work becomes a change order.
  4. Approve one round trip before shots leave. Otherwise every shot may need another render.
  5. Lock one Camera RAW decode. Otherwise plates and finals will not match.
  6. Prove frame rate end to end before photography. Otherwise picture and sound can drift.
  7. Prove the editorial relink before dailies arrive. Otherwise the DI rebuilds it manually.
  8. Set the change-list process before turnover. Otherwise DI and sound reconform blind.
  9. Hold the deliverables list before booking the DI. Otherwise incompatible masters must be remade.
  10. Fund the archive tier before anyone wraps. Otherwise the film may not restore.

Use the working Post Plan below.

Use these 27 actions when one or two people manage post. Assign every action. Complete Critical work before its dependency, or record an Exception and Waiver Record. Each action appears as one card. Read the action first. The smaller lines record who is responsible, when it happens, what proves completion, and its current state.

Field Production entry
Handbook checklist version 2.0
Production [PROJECT]
Checklist coordinator [NAME / ROLE]
Backup or successor [NAME / ROLE]
Working revision [REVISION]
Updated [DATE]
Approved by and date [NAME / DATE]
Issued to [PEOPLE / VENDORS]
Review cadence [WEEKLY / AT EACH MILESTONE / OTHER]
Next review [DATE]

Use these states:

State Meaning
Not started No work recorded.
In progress Assigned and active.
Blocked Record the blocker, next action, and escalation date in Evidence.
Done Link or name the evidence.
N/A Record why it does not apply.
Waived Record who authorized proceeding, the accepted risk, mitigation, target date, and next review.

Planning Milestones

Reopen affected rows when a camera, facility, master, delivery assumption, or approval authority changes.

Priority Responsible Action If skipped Due Cadence Evidence State
Critical Producer Name the checklist coordinator and backup. If unstaffed, book post consultations for planning, active post, and delivery. Nobody maintains the plan or escalates blocked work. When the production budget is first assembled Schedule: names and consultation dates Not started
Critical Producer List the people who approve picture, sound, cost, and scope. Record any contractual final-cut authority. Conflicting approvals reopen paid work. Before vendor bids Post-Production Roles List Not started
Standard Producer Set one notes, approval, change, waiver, and escalation process. Before the first creative review Note: review and change policy Not started
Critical Producer and director Record the aspect ratio, frame rate, exhibition goals, deliverables, and possible accessibility work. The intended exhibition may become impossible. Before post bids and camera tests Note: master and exhibition brief Not started
Critical VFX supervisor or VFX producer Break down the VFX shots, methods, complexity, assumptions, and clearance work. Missing work becomes a change order. Before requesting the first VFX bid Spreadsheet: VFX breakdown Not started
Critical Producer Obtain current post bids and reconcile them with the available budget before approving production. Required post exceeds the budget. Before committing the production budget Email: budget reconciliation and approved response Not started
Standard Producer Publish post dependencies, review cadence, and the next review. Before crew and vendor commitments Schedule: post schedule and review dates Not started
Critical Producer Name a qualified image-pipeline lead and backup. Contract a specialist when production cannot staff the role. Departments repeat incompatible image work. Before camera prep Email: named lead and backup Not started
Critical Image-pipeline lead Issue and revise the Image-Pipeline Specification. Vendors re-render under a corrected pipeline. Before camera and dailies tests After every revision Image-Pipeline Specification and email acknowledgment Not started
Critical Director, cinematographer, colorist, and image-pipeline lead Approve a camera-to-DI round trip on the intended display. Verify recording, playback, editorial, conform, sound, and master rates. Every affected shot needs reprocessing. Before photography Log: approved round-trip and frame-rate test Not started
Critical Editor, assistant editor, dailies lead, and DI Set editorial timebase, timecode, proxies, sound sync, metadata, and relink. Prove a relink to camera originals. The DI manually rebuilds the edit. Before editorial receives production dailies Log: editorial setup and relink test Not started
Standard Producer and image-pipeline lead Define the primary master, derivation order, and internal standard when no recipient is known. Before the DI bid is finalized Note: mastering strategy Not started
Critical VFX supervisor and producer Plan on-set VFX data. Review vendor capability, specifications, closeout terms, and the round trip before awarding shots. Missing reference adds reshoots or VFX labor. Before VFX production Note: data plan, executed scope, specifications, and approved test Not started
Critical Editor, assistant editor, VFX supervisor, sound supervisor, and DI Set turnover, change-list, reel-change, re-pull, and synchronization procedures. DI and sound bill another conform. Before the first turnover Note: turnover and change policy Not started
Standard Image-pipeline lead and affected department leads For pickups or reshoots, test the camera, lenses, decode, dailies, and sync against the established workflow. Document deviations and corrections. Before the pickup or reshoot Log: pickup test or approved deviation Not started

Recurring Checks

Create a record for every card, turnover, final, master, and exhibition.

Priority Responsible Action If skipped Due Cadence Evidence State
Critical Producer and data manager Require two verified copies, reconciled camera reports, and custody before formatting a card. The card is erased too early. After every offload Log: offload log and verification report Not started
Critical VFX supervisor, editorial, and plate-pull operator Identify cut, source frames, handles, specification, context, references, manifest, and checksums. The vendor restarts from correct frames. At every turnover VFX Turnover Count Sheet Not started
Critical Assistant editor Send the DI and sound teams the identified edit, interchange, reference, effects information, and current change list. DI or sound repeats the turnover. At every turnover and accepted picture change Files: DI and sound turnover packages Not started
Critical Assistant editor Compare every DI conform against editorial with a frame-accurate method and zero-frame tolerance. Finishing restarts the conform. After every conform or major revision Log: conform check report Not started
Critical VFX vendor or artist and VFX team Return the complete logical shot. Check zero net change, corrupt or missing frames, CG noise, NaN or infinity values, channels, and color before approval. DI returns or rebuilds the final. At every final VFX delivery Log: VFX delivery and QC record Not started
Critical Producer and QC provider Run file and playback QC. Assign failures, corrections, and re-QC. The master is rejected or screens defective. For every deliverable revision Delivery Acceptance Record Not started
Critical Producer, DCP author, and projection contact Validate and play the DCP on cinema equipment. Leave two business days for correction. The screening fails without repair time. Before every exhibition Log: playback report and correction buffer Not started

Standing Controls

Keep these active until vendors close and the archive is accepted.

Priority Responsible Action If skipped Due Cadence Evidence State
Critical VFX producer or coordinator and DI Maintain the current shot tracker and drop-in list with editorial use, intended revision, approval state, cost, and delivery date. DI inserts or pays for the wrong revision. After every VFX delivery or decision Spreadsheet: current tracker and drop-in list Not started
Standard Producer Schedule titles, captions, subtitles, audio description, color, sound, mastering, and their required approvals. Review at least weekly during finishing Schedule: finishing schedule and approvals Not started
Critical Producer, DI, and mastering team Maintain the deliverables matrix, master lineage, text and audio requirements, recipient specification or internal standard, and correction buffer. The masters must be remade. From final-grade planning through delivery Note: current mastering and QC plan Not started
Critical Producer or post supervisor Fund working storage through the complete post schedule. Record vendor retention and purge dates, maintain recoverable DI and editorial backups, and move material before a vendor deletes it. Deleted media needs recovery or recreation. Review at least monthly and before every purge Schedule: storage budget, retention schedule, and backup log Not started
Critical Producer and archive custodian Preserve the funded archive content, manifests, checksums, dependencies, custody record, and restore instructions. Keep two verified copies in separate locations and test representative restores. The film cannot be restored. Before vendors and post staff wrap DI Archival Documentation Not started

Use Full Checklists by Department when crew and vendors need separate rows for their assigned work.